Prism Calibration Centre

HVAC · Electrical · Plumbing · Clean Rooms · GMP Facilities · Gujarat

MEP Consulting
Services Gujarat

Gujarat's trusted MEP consulting partner — Mechanical, Electrical, and Plumbing engineering for pharmaceutical, food, industrial, and commercial facilities. GMP-compliant HVAC for clean rooms, electrical SLD and load design, process piping, utility optimization, and fire protection. From concept to commissioning qualification.

MEP Consulting Services Gujarat Prism Calibration Centre
HVAC System DesignElectrical EngineeringPlumbing & PipingMechanical SystemsClean Room HVACUtility OptimizationEnergy AuditFire Protection DesignGMP Facility DesignLoad CalculationSLD Preparation20+ Years ExperienceHVAC System DesignElectrical EngineeringPlumbing & PipingMechanical SystemsClean Room HVACUtility OptimizationEnergy AuditFire Protection DesignGMP Facility DesignLoad CalculationSLD Preparation20+ Years Experience
0+
MEP Projects
Across Gujarat since 2004
0+
Clean Room HVAC
GMP & ISO 14644 qualified
0+
Expert Engineers
MEP design & site supervision
0%
Client Satisfaction
On-time, compliant delivery

— WHAT IS MEP CONSULTING —

Engineering the Systems
That Make Facilities Work

MEP consulting covers the engineering of Mechanical (HVAC, process cooling, piping), Electrical (power, lighting, earthing), and Plumbing (utility, process, drainage) systems — the hidden infrastructure that determines whether a facility performs, passes audits, and operates efficiently.

MEP Consulting GujaratClean Room HVAC DesignGMP Facility EngineeringElectrical SLD DesignProcess Piping GujaratUtility Optimization

What Every MEP Project Includes

Mechanical + Electrical + Plumbing

Mechanical

HVAC, Chiller plants, Air handling unit design

Electrical

Power distribution, DG sets, Lighting design

Plumbing

Water supply, RO plants, Drainage systems

Fire Safety

Fire hydrants, Sprinklers, Alarm systems

Documentation

BOQ, Tender documents, Detailed CAD drawings

Compliance

NBC, Ashrae, IS standard compliance

— MEP SERVICE AREAS —

6 MEP Engineering Disciplines

Complete MEP engineering under one roof. View all services →

HVAC System Design

4 service areas

  • Clean Room AHU Design
  • Differential Pressure Cascades
  • Chiller & Cooling Tower Sizing
  • Ductwork Layout & Balancing

Electrical Engineering

4 service areas

  • Single Line Diagram (SLD)
  • Load Calculation & Panel Sizing
  • Cable Tray Layout & Earthing
  • DG Set & UPS Sizing

Plumbing & Piping

4 service areas

  • Process Piping Isometrics
  • Compressed Air System Design
  • Steam & Condensate Piping
  • Effluent & Drainage Layout

Mechanical Systems

4 service areas

  • Pumping System Design
  • Heat Exchanger Sizing
  • Vessel & Tank Engineering
  • Equipment Layout & Spacing

Utility Optimization

4 service areas

  • Steam System Efficiency
  • Compressed Air Audit
  • Cooling Tower Performance
  • Energy Balance Studies

Fire Protection Design

4 service areas

  • Sprinkler System Design
  • Hydrant Network Layout
  • Fire Detection System
  • NBC / TAC Compliance

— WHAT YOU GET —

Every MEP Project Includes

HVAC Engineering

AHU selection and sizing, ductwork layout, HEPA filtration, differential pressure cascade design, chiller and cooling tower sizing — GMP and ISO 14644 compliant.

Electrical SLD & Design

Single Line Diagram, load calculation, cable sizing and tray layout, panel schedule, earthing and lightning protection, DG and UPS sizing — NBC and IE Rules compliant.

Plumbing & Piping

Process piping isometrics, utility piping (compressed air, steam, condensate), clean utility design (WFI, PW), drainage layout — per project-specific standards.

Mechanical Systems

Pump and piping system design, heat exchanger sizing, vessel engineering, equipment layout with maintenance access, vibration isolation design.

Utility Optimization

Energy audit of steam, compressed air, cooling water, and HVAC systems. Identify waste, recommend upgrades with ROI calculations — typically 15–30% utility cost savings.

Fire Protection Design

Sprinkler system design (wet/dry), hydrant network, fire detection system layout, NBC / TAC compliance drawings and hydraulic calculations.

Construction Supervision

Site supervision during MEP installation — checking compliance with drawings, material quality, workmanship. Punch list preparation and defect closure before commissioning.

Commissioning & IQ/OQ

System commissioning protocols, HVAC balancing, air quantity measurement. For pharma: IQ/OQ documentation for HVAC qualification including pressure cascade verification and temperature mapping.

HVAC · Electrical · Plumbing · GMP Facilities · Pan-Gujarat

Need MEP Engineering for Your Facility?

Free consultation — project brief review and preliminary scope within 48 hours

— HOW IT WORKS —

MEP Project Delivery Process

01
STEP 01

Facility Study & Brief

Site visit, existing facility walk-down, review of architectural drawings, process flow, and utility requirements. Define MEP scope — new construction, expansion, or renovation. Document design basis and compliance requirements (GMP, FSSAI, NBC).

02
STEP 02

Concept & Scheme Design

Develop MEP system concepts — HVAC zones, electrical distribution scheme, plumbing route, utility generation. System sizing calculations. Client review and approval of concept before detailed design begins.

03
STEP 03

Detailed Engineering

Produce detailed drawings: HVAC layout with duct sizing, electrical SLD and cable schedule, plumbing isometrics, equipment data sheets. Coordination drawings to resolve clashes between mechanical, electrical, and civil elements.

04
STEP 04

Tender & Vendor Support

Prepare technical tender specifications, BOQ, and vendor evaluation criteria. Prism assists in contractor pre-qualification, bid evaluation, and technical clarifications — ensuring you select qualified contractors at the right price.

05
STEP 05

Construction Supervision

Site supervision during installation — checking equipment placement, pipe routing, duct installation, electrical terminations against approved drawings. Punch list preparation and defect rectification before commissioning.

06
STEP 06

Commissioning & Qualification

System balancing, pre-commissioning checks, commissioning test protocols. For GMP/clean room projects: IQ/OQ support, HVAC qualification (smoke test, air balance, pressure cascade verification, particle count, temperature mapping).

Industry Applications

Industries We Serve

Pharmaceutical & Biotech

GMP-compliant HVAC design for clean rooms (ISO 5–8), API plants, QC labs. Clean utility piping (WFI, PW, nitrogen), compressed air, HVAC qualification support (IQ/OQ/PQ). USFDA, WHO, EU GMP facility standards.

Know More

Food & Beverage

FSSAI and FSSC 22000 compliant MEP — food-grade stainless piping, HVAC for production zones, cold room design, compressed air (ISO 8573), effluent treatment piping. Hygienic construction standards throughout.

Know More

Chemical & Pharmaceutical

Chemical-resistant piping systems, HVAC with solvent vapor extraction, fume hood design, fire suppression for flammable liquids, ATEX-rated electrical systems for hazardous areas.

Know More

Commercial & Industrial

MEP design for industrial warehouses, office buildings, and commercial complexes — HVAC, electrical, plumbing, fire protection — all designed to NBC standards with energy efficiency targets.

Know More

Power & Utilities

Utility infrastructure design: cooling water systems, steam distribution, compressed air network, electrical substations, DG sets, UPS systems — for power plants and large industrial utility blocks.

Know More

Cold Chain & Logistics

Cold room MEP design — refrigeration system layout, insulated panel coordination, temperature monitoring, electrical supply for refrigeration equipment. Compliance with FSSAI cold chain standards.

Know More

Oil, Gas & Petrochemical

ATEX electrical design, gas detection system layout, fireproofing specifications, steam tracing design, instrument air systems — for refineries and petrochemical plants at Dahej and Ankleshwar.

Know More

Hospitals & Healthcare

Medical gas piping (O2, N2O, vacuum, air), HVAC for OT/ICU with HEPA filtration, nurse call systems, UPS/backup power for critical areas — compliant with NABH / ASHRAE healthcare standards.

Know More

Why Choose Prism

MEP + Calibration.
The Facility Partner You Need.

Prism combines MEP engineering expertise with NABL-accredited calibration — unique among Gujarat MEP consultants. Our designs are informed by deep knowledge of instrument requirements, process conditions, and GMP facility standards built over 20+ years of site experience.

GMP Facility Design Expertise
20+ years of pharma facility MEP — Schedule M, WHO GMP, EU GMP Annex 1. HVAC designs pass qualification first attempt.
Clean Room HVAC Specialists
ISO 14644 clean room HVAC — AHU sizing, pressure cascades, HEPA, qualification support for IQ/OQ/PQ protocols.
Compliance-Driven Engineering
Every drawing and calculation considers the compliance requirement — GMP, NBC, ISO, FSSAI — built in from design, not added as an afterthought.
End-to-End Project Support
From concept sketch to commissioning qualification — Prism manages the full MEP scope so you can focus on core business.
70+ Engineers
MEP design and supervision team
50+ Clean Rooms
GMP HVAC projects qualified
GMP Compliant
Schedule M, WHO, EU GMP design
All Gujarat
MEP projects across Gujarat
200+ Projects
MEP consulting delivered since 2004
Since 2004
20+ years of MEP expertise

— STANDARDS & CODES —

MEP Designs That Meet Every Standard

ISO 14644

Clean room classification & monitoring

WHO GMP

Clean room & facility design guidelines

EU GMP Annex 1

Sterile facility HVAC requirements

Schedule M (2023)

Indian GMP for pharma facilities

NBC 2016

National Building Code — electrical & fire

IE Rules 1956

Indian Electricity Rules compliance

FSSAI / FSSC

Food facility construction standards

ASHRAE 62.1

Ventilation for acceptable air quality

MEP + Calibration — The Complete Facility Solution

Prism designs the MEP systems AND calibrates the instruments that monitor them. Our NABL CC-2480 accredited laboratory calibrates the temperature sensors, pressure gauges, flow meters, and environmental monitors specified in our MEP designs — providing a complete, audit-ready facility solution from one partner.

200+

MEP Projects

50+

Clean Rooms

— Our Clients —

Trusted By Gujarat's Leading Industries

Zydus Lifesciences
Zydus Lifesciences
Pharmaceutical
Alembic Pharma
Alembic Pharma
Pharmaceutical
Sun Pharma
Sun Pharma
Pharmaceutical
ONGC
ONGC
Oil & Gas
Indian Oil
Indian Oil
Oil & Gas
NTPC
NTPC
Power & Energy
HPCL
HPCL
Oil & Gas
Adani Group
Adani Group
Conglomerate
Zydus Lifesciences
Zydus Lifesciences
Pharmaceutical
Alembic Pharma
Alembic Pharma
Pharmaceutical
Sun Pharma
Sun Pharma
Pharmaceutical
ONGC
ONGC
Oil & Gas
Indian Oil
Indian Oil
Oil & Gas
NTPC
NTPC
Power & Energy
HPCL
HPCL
Oil & Gas
Adani Group
Adani Group
Conglomerate

— CLIENT VOICES —

What Our MEP Consulting Clients Say

Prism handled the complete MEP design for our new API manufacturing block — HVAC design for clean rooms, compressed air piping, electrical load calculation, and utility layout. The documentation was GMP-compliant and audit-ready. Excellent coordination between the mechanical and electrical teams.
Sanjay Desai
We engaged Prism for MEP consulting for our facility expansion. Their HVAC engineering for the clean room areas was detailed, with proper differential pressure cascades and AHU selection. The project was delivered on time and the HVAC system passed clean room qualification on the first attempt.
Hardik Shah
Prism provided MEP consulting for our food processing plant expansion. Utility piping design, electrical SLD, and HVAC layout — all delivered with proper documentation and vendor coordination. Their team understood food-grade construction requirements and FSSAI compliance.
Priya Mehta
Prism handled the complete MEP design for our new API manufacturing block — HVAC design for clean rooms, compressed air piping, electrical load calculation, and utility layout. The documentation was GMP-compliant and audit-ready. Excellent coordination between the mechanical and electrical teams.
Sanjay Desai
We engaged Prism for MEP consulting for our facility expansion. Their HVAC engineering for the clean room areas was detailed, with proper differential pressure cascades and AHU selection. The project was delivered on time and the HVAC system passed clean room qualification on the first attempt.
Hardik Shah
Prism provided MEP consulting for our food processing plant expansion. Utility piping design, electrical SLD, and HVAC layout — all delivered with proper documentation and vendor coordination. Their team understood food-grade construction requirements and FSSAI compliance.
Priya Mehta
Prism handled the complete MEP design for our new API manufacturing block — HVAC design for clean rooms, compressed air piping, electrical load calculation, and utility layout. The documentation was GMP-compliant and audit-ready. Excellent coordination between the mechanical and electrical teams.
Sanjay Desai
We engaged Prism for MEP consulting for our facility expansion. Their HVAC engineering for the clean room areas was detailed, with proper differential pressure cascades and AHU selection. The project was delivered on time and the HVAC system passed clean room qualification on the first attempt.
Hardik Shah
Prism provided MEP consulting for our food processing plant expansion. Utility piping design, electrical SLD, and HVAC layout — all delivered with proper documentation and vendor coordination. Their team understood food-grade construction requirements and FSSAI compliance.
Priya Mehta

Get In Touch

Request a Free MEP Consultation

Share your facility type, location, approximate area, and MEP requirements. We respond with a preliminary scope and fee proposal within 48 hours.

Address
F-101, Rudraksh Complex 2, Phase 3, GIDC Vatva, Ahmedabad 382445

Send an Enquiry

Project Coverage

MEP Projects
Across All of Gujarat

Prism delivers MEP consulting across all Gujarat cities and GIDC industrial zones.

10 Major Cities · All GIDC Zones
Ahmedabad
Vadodara
Bharuch
Dahej
Ankleshwar
Surat
Rajkot
Gandhinagar
Nadiad
Anand

— FAQ —

MEP Consulting — Frequently Asked Questions

Free consultation — preliminary scope within 48 hours

Need MEP Engineering in Gujarat?

Call or WhatsApp to discuss your MEP project — HVAC, electrical, plumbing, or complete facility engineering. GMP and FSSAI compliance built in.

Prism Calibration Centre · F 101, Rudraksh Complex 2, Phase 3, GIDC Vatva, Ahmedabad, Gujarat 382445

MEP Consulting Disclaimer

MEP consulting services provided by Prism Calibration Centre are based on information and requirements provided by the client. Final designs are to be reviewed and approved by the client and relevant statutory authorities before construction. Prism is not responsible for changes in applicable codes or standards after design completion. Site conditions and actual construction quality are the responsibility of the appointed contractor.